国产成人一区二区三区影院动漫,久久久久亚洲av无码专区体验,99亚洲男女激情在线观看,久久www成人_看片免费不卡

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.dwdkj.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

亚洲中文久久精品无码1| 疯狂迎合进入强壮公的视频| 久久精品国产精品亚洲下载| 亚洲中文字幕无码乱线久久视| 国产69精品久久久久99尤物| 无码粉嫩虎白一线天在线观看| 国产乱视频在线观看| 夜夜躁狠狠躁日日躁视频| 人与人性恔配视频免费| av天堂东京热无码专区| 四虎国产精品永久免费网址| 成人国内精品久久久久一区| 亚洲中字幕日产av片在线| 曰本极品少妇videossexhd| 欧美成人欧美va天堂在线电影 | 亚洲精品av一区在线观看| 2020精品国产福利在线观看香蕉| 欧美成aⅴ人高清ww| 欧美特级特黄aaaaaa在线看| 丰满人妻一区二区三区视频| 日本xxxx丰满老妇| 国产午夜人做人免费视频中文 | 亚洲成a人片在线观看天堂| 在线精品亚洲一区二区动态图| 全部免费毛片在线播放| 99蜜桃臀久久久欧美精品网站| аⅴ资源中文在线天堂| 亚洲高清毛片一区二区| 天天干天天日夜夜操| 欧美乱妇高清无乱码免费| 国产jk精品白丝av在线观看| 亚洲人妻av伦理| 日韩高清在线中文字带字幕| 99久久99久久精品免费看蜜桃| 精品乱码卡1卡2卡3免费开放 | 国产看真人毛片爱做a片| 三年片大全在线观看免费观看大全 | 日本一卡二卡3卡四卡网站精品| 少妇高清一区二区免费看| 香港三日本8a三级少妇三级99| 国产偷亚洲偷欧美偷精品|